The backsplash is the most-seen tile in the house
Guests stand at the island and look straight at the range wall, which puts the backsplash in front of more eyes than any other surface you own. We plan the layout around that sight line. The pattern centers on the hood, the cuts at each end of the run come out matched rather than one full tile and one sliver, and the edges finish in mitered returns or a fine metal profile instead of a bullnose that announces itself.
Floors that handle the hardest-working room
Kitchen floors take dropped pans, rolling stools, dogs, and 20 years of foot traffic, and porcelain handles all of it when the substrate underneath is right. We flatten and prep before the first tile is set, control lippage on large formats the same way we do inside a shower, and offer radiant heat under any kitchen floor we build.
How kitchen work fits the schedule
Kitchen tile scopes are contained work. Backsplashes finish in 2 to 3 days and floors run about a week including substrate prep, which slots them cleanly between our bathroom builds and keeps the calendar honest for everyone. We set the tile scope inside your kitchen project and coordinate timing with your cabinet and countertop trades. Full bathroom remodels remain the flagship of the schedule.